Threaded Rods – Zinc Plated Threaded Rod DIN 975 / DIN 976

Fully threaded rods to DIN 975 and studs to DIN 976, zinc plated carbon steel. Diameters M3–M36, grade 4.8 / 8.8, standard 1m / 2m / 3m lengths or cut to order. For pipe supports, anchors, formwork and general fabrication.

Category: Tag:
INQUIRE NOW

Quick Quote — Reply within 24 h

Order sizeFrom 100 kg/spec · tonne & container quantities for projects
Lead time15–25 days after deposit (stock items 5–7 days)
Payment30% T/T deposit · 70% before shipment (other terms negotiable)
Trade termsFOB · CIF · DAP · EXW
InspectionSGS / BV third-party · EN 10204 3.1 MTC
PackingBulk carton, pallet, or private label (OEM)
Tender supportMTC · CO · HS codes · delivery commitment

Bulk, project and tender quantities — wholesalers, importers, EPC contractors and tender buyers welcome.

Threaded Rods DIN 975 / DIN 976 (Zinc Plated)

Threaded rods — also called all-thread rods, studding or threaded bars — are lengths of bar with a continuous thread along the whole length, so a nut can be positioned at any point. DIN 975 covers fully threaded rods, while DIN 976 covers studs. They are cut to length on site, which makes them the standard choice for hangers, supports, tie rods and temporary works where an adjustable connection is needed.

Technical Specifications

Parameter Specification
Standard DIN 975 (threaded rod) / DIN 976 (stud) / ASTM A307
Thread Metric Coarse, full thread (UNC / UNF on request)
Size Range M3 – M36
Length 1 m / 2 m / 3 m standard, cut to order
Material Carbon Steel Q235 / 35K / 40Cr
Grade 4.8 / 8.8
Surface Finish Zinc Plated (Clear / Blue-White), Hot Dip Galvanized, Black Oxide
Ends Chamfered or plain cut, nuts and washers optional
MOQ 500 pcs (standard), 2,000 pcs (custom)
Lead Time 7-15 days (standard), 20-30 days (custom)
Packaging Bulk cartons / Wooden pallets / Custom labeling

Available Sizes

M3, M4, M5, M6, M8, M10, M12, M14, M16, M20, M24, M30, M36

Applications

  • Pipe hangers and support systems
  • Anchor and tie rod assemblies
  • Formwork and scaffolding tie rods
  • Electrical conduit and cable tray support
  • Machinery adjustment and levelling
  • Solar mounting and greenhouse structures

Certifications

ISO 9001:2015 certified. Material certificates (EN 10204 3.1/3.2). RoHS and REACH compliant.

Frequently Asked Questions

Zinc plated or hot dip galvanized threaded rod?

Zinc plating is economical for indoor, dry environments. Hot dip galvanizing gives a much thicker coating for outdoor, humid or chemical exposure. We also supply stainless steel A2/A4 rod for corrosive duties.

What sizes are available?

Available sizes range from M3 – M36. Contact us with your required sizes and quantities for a quick quote.

What is the MOQ and lead time?

The MOQ is 500 pcs (standard), 2,000 pcs (custom). Lead time is 7-15 days (standard), 20-30 days (custom). Mixed-size containers and larger orders are negotiable — send us your requirement for a quick quote.

Do you provide material certificates?

Yes. Material test certificates per EN 10204 3.1 are available on request, and our manufacturing is ISO 9001:2015 certified. RoHS and REACH compliance documentation can also be provided.

ShareWhatsAppLinkedInEmail
Wholesale · Bulk · Tender & Project Supply

Full-Range Fasteners for Wholesalers, Importers, EPC Contractors & Tender Buyers

Ready stock and bulk supply for wholesalers, importers, distributors, building-material merchants, EPC contractors and tender buyers. We quote by the tonne and by the full container, and we supply the documentation package that tender submissions require — MTC, CO, third-party inspection and a signed delivery commitment.

  • Ready stock · full-range fasteners held in stock for fast dispatch
  • Bulk & container pricing · tonne and 20GP / 40HQ quantities with dealer, distributor, importer and stockist tiers
  • Tender & project supply · EN 10204 3.1 MTC, CO, third-party inspection (SGS / BV), HS codes and delivery commitment for bid documents
  • Resale packing & private label · your brand, barcode and cartons
  • Merchant terms · T/T payment, FOB / CIF / DAP, 15-25 day lead time, staged delivery per construction schedule

Bulk and project quantities supplied worldwide — wholesalers, importers, distributors, EPC contractors and tender buyers.

Stay in touch